Stride Bus Rapid Transit Is On the Way–Eventually

Work on Sound Transit’s bus rapid transit program–Stride–is progressing, though slower than originally hoped. Some Stride lines’ targeted openings have slipped from 2024 to 2025. Agency staff recently briefed the Sound Transit Board of Directors about a revised delivery timeline and some flashy vehicle branding. The program is composed of three distinct projects: Lynnwood to … Continue reading Stride Bus Rapid Transit Is On the Way–Eventually