Issaquah Eyes New I-90 Bridge to Connect to Future Light Rail Station
The preferred concept for an I-90 bridge in Central Issaquah would cost at least $110 million, and is seen as an essential component of creating a more connected neighborhood around a future light rail station. Councilmembers are wary about jumping in with both feet.
Emergency 1-Line Rail Repairs to Halt Downtown Service on Busy Weekend
All 1 Line stations in Downtown Seattle will be closed Saturday June 21 to Sunday June 22, after Sound Transit discovered a section of rail in need of replacement near Westlake. The agency plans to run shuttle buses to bridge the gap every 30-60 minutes. Alternate transit routes may best serve riders.
Op-Ed: Shrinking Sound Transit’s Oversized Stations Could Save Hundreds of Millions
Sound Transit diverges from international standards by building oversized underground stations that add hundreds of millions in costs to little benefit. Overhauling the agency’s planning framework to promote more efficient designs could help keep projects on track as they face massive financial strain.
Sound Transit Picks New Preferred Light Rail Route to Tacoma Dome
After navigating through a number of major issues that added years of delay, the Sound Transit board is poised to adopt a new preferred alternative for Tacoma Dome Link. The project isn't slated to reach full design until 2027 and to open until 2035.
Sound Transit Shutters Redmond Link for Repairs Attributed to Heat Wave
Last night, Sound Transit announced it was shutting down 2 Line light rail service on its new Redmond segment (which just opened May 10) to allow for overhead wire repairs. Until that work is complete and inspected, a bus bridge is replacing the light rail service, connecting to Overlake Station where the 2 Line continues to operate in the shortened segment to South Bellevue.
Council Committee Rejects Bid to Add Red Tape to Light-Rail Permitting
Rather than jumping through new hoops to submit permit applications, Sound Transit will instead simply need to submit a report laying out the public outreach it conducted. The change should allow the original intent of the bill to streamline permitting to be maintained.
Rivera Proposal Would Slow Down Seattle Light Rail Permitting
Councilmember Maritza Rivera's last-minute proposal would require additional public outreach and documentation for light rail permit applications. The underlying bill had been intended to cut red rape. After pushback from Councilmembers Rinck and Strauss, the vote was delayed a week.
Sound Transit Starts I-90 Testing, Full 2-Line Opening Slips to 2026
The unpowered tow across the I-90 floating bridge Wednesday marks a big milestone for the beleaguered East Link project. A grand opening of the 2 Line in early 2026 is highly dependent on how the next few months of testing go.